Another issue with the back of the house being the de facto front nowadays is the utility room, added some time in the 1990s. It is a natural "junk" room but it's also, now, effectively the principal entrance.
A partition has now been built, dividing the utility room in two and creating a short hallway, convenient for wet clothes, boots, etc. between the back (front!) door and the kitchen. The untidy electrical distribution/meter area has also been boxed in to make it less obtrusive. Some plastering, a new paint job and LED lighting completed the project. At the same time, I took the opportunity to replace the horrid fluorescent tube lighting in the kitchen with LEDs. The entire house is now LED lit.
No comments:
Post a Comment