Friday, 29 May 2026

Foundations laid

Demolition and ground works continued through May, culminating in the foundations being laid on 13th May.  

The remainder of the garage walls were demolished, broken up and fed to the stone crusher. The garage's concrete floor and other areas of concrete base followed quickly, feeding the crusher's voracious appetite for most of a full day. A very large pile of hardcore ensued...

...far more than we will ever need for the job, so we were happy when a local farmer pal came along asking if he could take some of it. Good result all round!

By 10th May we had finally cleared all the old concrete, together with all manner of buried rubbish that has obviously accumulated in the 100-odd years since Pennine View was built. The foundations were dug and the local council building control inspector came along to check that all was in order.

At 07:30 on the 13th an enormous concrete pump arrived and a few minutes later the ready mix concrete truck was on site and being hooked up. Before long the foundations were being laid. 

 

That took under an hour to complete! Finally the preparatory groundworks were completed and we could start the actual building work.

Wednesday, 29 April 2026

And we're off!

Last week the large door was removed from the old garage for safe keeping - it is relatively new and a high quality unit that will be refitted to the new building in due course. A specialist company came along and removed the asbestos roof for safe disposal. And I took on the daunting task of removing 25 years-worth of stuff that might be useful one day and deciding what to keep. The large skip outside my house is nearly full but so is the old summerhouse which is now repurposed as a temporary store.

This morning a veritable army of kit arrived at Pennine View: Two excavators, a stone crusher and a wheeled dumper, together with two lads intent on knocking down the old garage.

This is. of course, the messiest, dustiest part of the job but it was a fine spring day, with a light breeze conveniently blowing the dust away from the house. By lunchtime the two gable ends of the old garage were reduced to rubble and that allowed the stone crusher access to start its dread work. 


As evening approached just one wall of the old garage remained and that will certainly be gone tomorrow. Of course there is much more demolition work to do - all the hardstandings have to be broken up, as do the old foundations. But we are under way at last!

Friday, 10 April 2026

Project planning

The past few weeks has seen the project plan coming together nicely. 

The structural analysis work was completed back in March and the architectural work is similarly more or less completed. The project has been registered with the council's building control department so there are no further administrative tasks outstanding. 

The grand plan
One problem that has exercised me is what to do with all the stuff that is in the garage and summerhouse. Most of the summerhouse stuff is garden furniture that with the better weather can now be outside. 

A cunning plan was hatched by my builder to move the summerhouse away from the construction work area, onto the patio, so it can be used to store garage stuff. I must confess that I had my reservations as to the feasibility of moving such a large structure intact but I reckoned without the capabilities of four strapping lads and sure enough it was quickly repositioned within a couple of hours this morning.

The summerhouse repositioned and repurposed as a temporary store
This leaves the work area clear and I can now take my time shifting the garage paraphernalia into the summerhouse. It's an opportunity for a good clear out too, after 25 years of accumulating stuff that might, one day, be handy but which is then never looked at again.

Demolition work will likely commence before the end of April with the first item on the agenda the removal and safe disposal of the asbestos roof material on the garage. Around the same time the existing double garage door will be removed and taken away for servicing, to be reinstalled on the new garage in due course.

It's starting to feel real now, almost 10 months after the original idea was born. 

 

Thursday, 26 March 2026

So what's it all about then?

The plan is to build what is effectively a three-car garage, although there is a vanishingly small prospect of ever getting three cars in there. Realistically, the layout of the driveway and access to the garage makes it nearly impossible for anything other than a tiny car to get into the rightmost slot. But that space is super useful for garden maintenance equipment and general "stuff". 

In addition, there is a rather elderly summer house built of softwood that is coming to the end of its useful life. Between the garage and the summer house is, practically speaking, wasted space, about 2.5m wide that could be made better use of.

The existing garage and summer house, showing 
the extent of the proposed new development  

The plan therefore is to demolish the existing two car garage and the old summer house and build a single story three car garage/sun room plus storage areas in the vacated space, overall some 12m x 7m. 

Architect's drawing looking 
from the south

Architect's drawing looking 
from the north

 

 

 

 

 

 

Architect's plan
The garage will have room for a good sized workshop and space for garden furniture, tractor, etc. Above the garage will be a large loft space which will no doubt get filled with junk in no time. The sun room section will extend up to roof level to give a tall open space with glass on two sides. Behind the sun room is further ground level storage. 

Planning approval has been obtained and the structural design is completed. I've selected the builder and we meet next Monday to kick off the project, with a planned start date in mid-late April.

And then...

Thirteen years ago I had this sudden urge to develop Pennine View from the small cottage on a big plot of land into a somewhat bigger country residence. The project was a huge success and you can read all about it, or at least as much as I am willing to tell you, in the posts below.

I rather thought that I was done with big projects but it seems not. Nine months ago I was struck by another sudden urge, this time to get a little sports car for those nice sunny days that we occasionally get up here in Cumbria. Well that rather genteel notion was never going to suffice and so it was that I ended up buying a Jaguar F-type, all eight cylinders, five litres and 550 horsepower of it. 

Now the F-type, whilst great fun is a totally impractical car, being a true two seater with a rather small boot - but an enormous, E-type-esque bonnet to hide that chunky V8 engine. Not much good for carrying stuff, in other words. It's also rather low to the ground and some of my less agile friends do not fit into it well...

And so I became a two car household.

Pennine View does have a double garage but half of that is full of workshop, a garden tractor and other maintenance paraphernalia needed for a couple of acres of prime Cumbrian countryside. Then there's all the usual stuff that one acquires after 25 years of living in the same place. So in practice, it's a bit of a fight to fit just one car into the remaining space. I really would prefer to be able to get both cars under cover, especially during the winter months when it can get pretty wild up here.

And so a new project is born and this Blog awakens from its slumbers as documentary evidence.  

Pennine View in March 2026 - a view from my drone

Monday, 27 March 2017

The last post

Well the extension is all done and the rest of the cottage is completely refurbished. Outside the patio looks great and the landscaping has matured so that it looks as if it was always there.

For those that were following - I hope you found it interesting and informing. The Blog will remain as a record of the largest building project I've ever done. It was fun but I'm glad it's over!

Job done, Blog done, last post. Pennine View OUT!

Thursday, 6 August 2015

Painting the outside

It's been a while coming but the outside is finally being painted. The new extension is particularly challenging, as it is rough pebble dash, in keeping with the rest of the house but, having never been painted before is something of a sod. It's amazing how a bit of paint brightens up the exterior appearance! I think it'll look really nice when it's finished, hopefully within the next week.

Before
Making a start
Looking better
Painting the black bits makes a surprising difference...


Nearly done... just in time for my birthday party!

Monday, 27 July 2015

Sorting out the utility room

Another issue with the back of the house being the de facto front nowadays is the utility room, added some time in the 1990s. It is a natural "junk" room but it's also, now, effectively the principal entrance.

A partition has now been built, dividing the utility room in two and creating a short hallway, convenient for wet clothes, boots, etc. between the back (front!) door and the kitchen. The untidy electrical distribution/meter area has also been boxed in to make it less obtrusive. Some plastering, a new paint job and LED lighting completed the project. At the same time, I took the opportunity to replace the horrid fluorescent tube lighting in the kitchen with LEDs. The entire house is now LED lit.


Wednesday, 10 June 2015

A new front gate

When Pennine View was first built the front of the house was on the south side, looking out over the fields towards New Mill Flatt, on whose land the cottage had been built for the farmer's family. It was before the days of widespread car ownership and so the back of the house opened out onto a back yard and not much else.

By the 1970s the bungalow had been extended with the addition of a kitchen to the north side and the back yard had become a car park, with a rather awkwardly offset entrance made in the hedgerow on the northern edge of the property. With most people now arriving by car, the back of the bungalow had now effectively become the front!

The old gate was at an awkward angle to the driveway and not especially wide. Improvement was called for. The new gate is 18" wider and the awkward angle has been more or less removed, making access considerably easier, especially for larger vehicles. New gateposts had to be erected and the opportunity was taken to reverse the opening, further improving access.

With the new gate installed the road side access was tarmacked and new limestone chippings laid on the drive side. The result is quite pleasing!


 

Two years ago...

... Pennine View was a completely different home. What started out in June 2013 as a relatively simple, if quite substantial extension morphed into a much wider ranging programme of improvements to the rest of the house and its grounds.

Most of the work was completed by autumn 2014 and nothing much happened during the winter, which brought a little snow.

The intervening six months gave the new landscaping time to settle in and afforded the grass seeded areas the opportunity to become established. A few minor cracks started appearing in the plaster, mainly around the join between old and new and the pointing work on the patio suffered a bit during the winter.

With the arrival of spring the final touches are now being applied. These are:
  • Adding a wall to the utility room, to create a hallway for the back door into the kitchen
  • Installing LED down-lighting in the kitchen and utility room
  • Fitting a new wrought iron gate at the side of the bungalow and improving the wall behind the summer house
  • Fitting a new, wider front gate, straightening the access line into the driveway and generally tidying up the front of the property
  • Fixing those cracks
  • Reworking the pointing on the main patio area, which suffered a bit during the winter frosts
  • Painting the exterior.
More on each of these shortly.


Sunday, 31 August 2014

Landscaping

With the completion of the patio area and paths around the newly extended Pennine View, the last few weeks has been occupied with landscaping work. A particularly dry June/July meant that the soil was too dry and hard to be easily worked but early August brought quite heavy rain and with it the ability to rotavate and grade the soil.

There was just enough top soil to grade the lawn from field level up to the new pathway level, some 2ft higher, in the SE corner of the property. The whole area has now been seeded with a rye-based grass which should establish itself during the autumn and over winter.

Whilst I was at it, I also reseeded two areas behind the garage that were used as a storage area and for mixing cement, etc. I've also rotavated and graded the area by the septic tank, which is where we stored the top soil during construction work.

Unfortunately, the local mole population seems to have discovered all this good work and sees it as an excellent opportunity for easy tunnelling and, presumably, a plentiful supply of worms. Not much that I can do about this without doing further damage until the ground firms up. The indigenous rabbits have also been having fun digging holes in my nicely graded top soil. The vicissitudes of living in the country!




Nearly two years after the first thoughts about building an extension emerged, I'm finally getting to the end of this odyssey. There remain a couple of small work items that will be done as and when materials and builders' time are available. Much as I would like to get the outside painted, I now suspect that will be a job for 2015.


Friday, 13 June 2014

High speed broadband @ PV

Not really related to the extension project but going on alongside and improving the property, I now have high speed broadband at Pennine View!

For the last ten years or so, the best broadband speed I could get was around 2.5Mbit/s. Ten years ago that wasn't too bad but the rest of the world has moved on and rural Cumbria has not. Well that has all changed with the installation of a Lonsdale Network Services wireless node here at PV.



I am now getting broadband speeds in excess of 60Mbit/s - far faster than most town dwellers get on their telephone line-based service. The intention is for PV to become a relay node, beaming high speed broadband down into Sleagill village, so they too can benefit from this excellent service.

Patio nears completion

It's taken a while but the new - and very large - patio is more or less finished in time for summer. Including the paths, some 80 square metres of terracotta stone has now been laid. Big job!


The pathway to the back door is also finished and graded into the driveway area with stone chippings  - a great improvement. Steps down to the garden from the southern edge of the patio is the next job, some time next week. After that I'll be able to get on with grading the lawns up to the patio using all the soil that was displaced by the extension work.


In other news, the last of the old-style windows around the north side of the cottage have been replaced with four new hardwood frames and modern double glazed units.Should be a bit warmer in the kitchen during the winter months!

Friday, 23 May 2014

The patio takes shape

Another week of stop/start progress, hindered yet again by the weather. After the retaining wall was built the builder was able to fill the void with hardcore and flatten it with a "wacker" to provide a solid base for the flagstones. The past few days have seen most of the very large patio area finished with red sandstone flagstones.




In addition, the builder has been laying stones from the back door around the side of the house. This required some careful work with levels to ensure that there was a suitable slope for rainwater run-off. The old path around the west side of the cottage was very good at collecting pools of water but hopefully we've fixed that now.

The patio area is starting to look rather good!

Wednesday, 14 May 2014

Starting on the patio

It's been a while coming, what with the dreadful weather and tradesman availability but at last we got started on the patio today. First we needed to level the area down to hard sub soil. This produced a considerable amount of top soil which we will use to build up and grade the low lying land notably in the south east corner It's certainly a large area!

We had about seven tons of hardcore delivered by tractor and for now this has been barrowed through and heaped up in the patio area, awaiting completion of drainage and a small retaining wall, both of which we hope to finish this week.

Whilst we had the digger, we took the opportunity to move all the top soil that was saved from digging out the extension area. This soil will also help to bank up the low land which will be an interesting landscaping challenge for my gardener!

Finally we dug out the discharge pipe from the septic tank. This has been working poorly for some time and today we discovered the reason! Over the 80+ years since the house was built tree roots have cracked the old fashioned porcelain pipes, allowing mud and debris to enter. We're planning to leave it overnight to dry out with a view to finding a solution tomorrow.

All in all we made a lot of mess (and a lot of progress) today!